build log

Daily Plans, Weekly Ships.

The build log is where I track the work in public.

Not a diary. Not a highlight reel.

What I planned, what changed, what shipped, and what I learned.

4
weeks
0
shipped as planned
× 0
nothing shipped
4
something else shipped
9
total shipped
A ship is public-viewable and intentionally shared.
Week
Plan
Notes
Ship
Takeaway
Shipped

Week 05

May 18-24
SignalOS + Atla
Shipping takes longer when everything matters
I want to ship five things. I need to ship two.

Week 03

May 04-10
SignalOS
Built SignalOS + Atla
Made a quick demo
Shipped Playwave
Pages can ship while software keeps improving.

Week 04

May 11-17
SignalOS + Atla
Finished more SignalOS
Built Pixel Press path
Prepped Life Reports
Close is not shipped.
Week
Plan
Notes
Ship
Takeaway
Shipped

Week 02

Apr 27-May 03
SignalOS
Worked on SignalOS
Needed more SSME time
Shipped Inbetween
Fast is not clean.